top of page
Gran Cielo, Lot 17 — Structural Steel Columns
Category:
Commercial / Structural
Location:
San Luis Obispo, CA
Project Date:
February 1, 2026
Status:
Completed
Built For:
Abbott Reed
Fabrication and installation of four structural steel columns, built and set to plan.
Column work lives and dies on anchor-bolt placement. We handled it with direct, up-front coordination to confirm the layout before fabrication. Abbott Reed set the bolts accurately and the columns went in clean.
Shop drawings, full fabrication, and crane installation.
1/0
bottom of page
